Capital City Housing manages Aloe Ridge, a multi-village estate. By 2024, the estate was facing four problems at once.
Capital City Housing needed hard evidence behind any decision that carried this much financial weight.
African Crake Projects, working with Ant Consult, carried out a full investigation of Villages 1 and 2. We set out to do four things.
We began on site, physically verifying pipe sizes, materials, and condition rather than relying on the estate's existing records, and mapping every valve, meter, hydrant, and other component across the network.
That work produced a complete digital record of the potable water, fire, sewer, and stormwater networks, delivered as maps and drawings Capital City Housing's team can use directly.
It replaced the outdated, incomplete drawings the estate had been working from, and Capital City Housing now uses it as its primary record for the network, the reference point for future maintenance and decisions.
We then installed monitoring to track flow and pressure across the network over time, and built a computer model of how the system should behave under normal conditions. Comparing what the model predicted against what we measured on site is what let us pinpoint exactly where leaks, faults, unmetered connections, and pressure problems were happening, rather than guessing from the paperwork.
We found an unmetered pipe (Ø250 mm bypass) connecting Village 1 and Village 2 that nobody knew was open, and closed it. Beyond that, the potable water system was losing roughly 147,000 ℓ/day, close to half of everything flowing into the network, before it reached a single tap. The fire system was leaking too, a smaller but steady loss of around 43,000 ℓ/day.
Pressure was a problem in both systems. In the potable network, pressure was running as high as 120 m in places, close to double the 60 m rating of the pipework, the likely explanation for repeated bursts and failures. The fire system was running similarly high, modelled at up to 118 m.
Village 2 told a different story. Leakage in the potable system was close to zero, and the fire system showed almost no losses either. The only issue was pressure running higher than it needed to, with room to bring it down safely by roughly 20 to 30 m, about 2 to 3 bar, without affecting residents' water supply.
The core fix in both villages was pressure reducing valves, PRVs, equipment that automatically holds network pressure at a safe set point instead of letting it run unchecked.
Capital City Housing left with a definitive picture of exactly where water was being lost across the network, and just as importantly, where it was not.
The Aloe Ridge investigation turned a poorly documented, high-loss system into an asset management plan built on real data, giving Capital City Housing the confidence to prioritise where to spend next.